Has been confirmed - two 500kV lines there's been a tower structural failure.Reports indicated a major transmission line was brought down by a storm.
Has been confirmed - two 500kV lines there's been a tower structural failure.
How long does it take to build a tower?Has been confirmed - two 500kV lines there's been a tower structural failure.
Real issue:How long does it take to build a tower?
Imported Chinese steel?Real issue:
if you go back a few pages on this thread is that there seems to be a structural issues with our towers, I remember a dhole discussion about that and an enquiry launched if my memory serves me well.
Anyone remember?
Not even, wrong design but between failing structure due to lower spec materials, wrong design, 1 in a 100 events which are often completely bogus, add lack of maintenance..and here you go.Imported Chinese steel?
It seems there's actually 6 towers on the ground in total, at least that's the information available thus far.How long does it take to build a tower?
Well it will give people a first hand experience of an electrical system, that is running on the ragged edge, I would guess this is just a precursor to what's ahead.Substantial load shedding and an emergency situation underway in Victoria at present.
Loy Yang A, the state's largest power station of any type, has completely ceased operation at approximately 14:10 Victorian local time with all four generating units tripping and now at zero. Immediately prior to that, all was normal indeed they were running at full capacity.
Cause unknown at this stage, anything there would be speculation.
We , and this includes many people aware not to say expert, have been forecasting this for a long time with figures ready, it could be worse, Qld is much cooler this week, imagine with a bit more stress here ...Well it will give people a first hand experience of an electrical system, that is running on the ragged edge, I would guess this is just a precursor to what's ahead.
A record to break: ready start go...Things certainly sound bad in Victoria, it must have been a massive storm.
Fears dozens of homes lost in Victorian bushfire, 135,000 still without power — as it happened
Hundreds of thousands of Victorians remain without power in the wake of deadly storms and destructive bushfires which swept the state on Tuesday.www.abc.net.au
Hundreds of thousands of Victorians remain without power in the wake of deadly storms and destructive bushfires which swept the state on Tuesday.
The energy market operator says it could take days, and possibly weeks, to restore electricity to some of the 220,000 properties still without power.
Energy Minister Lily D'Ambrosio called it "one of the largest outage events in the state's history".
It will certainly be interesting, as if they are all interconnected, the major users will be depleting the storage at a much faster rate, than those in a residential environment.This outage certainly makes one think.
Imagine a far more diverse energy generation and transmission system.
Many thousands of households, businesses and community facilities with solar power, large batteries and plug in EVs
Multiple community battery banks storing and releasing excess power from these industrial warehouses, schools, community building hosting PV arrays.
It will certainly be interesting, as if they are all interconnected, the major users will be depleting the storage at a much faster rate, than those in a residential environment.
@Smurf1976 A bit of a disaster, the Callide incident, doing this sort of work online a bit tricky.
But to have it take out the DC control cct's plus the emergency lighting and DC auxiliaries supplies seems a bit weird. Off one common board or dud batteries, certainly a mess and no wonder the Turbine blew up a 50+ton shaft spinning at 3,000rpm with no bearing oil supply isn't good.
'Extraordinary chain of events' led to power station explosion, report finds
An explosion at a central Queensland power station that left almost half a million people without power could not have been anticipated, according to a report into the incident.www.abc.net.au
The report found that on May 25, 2021, a new DC system with a battery charger had been commissioned and was being connected to the C4 unit.
"Voltage unexpectedly dropped to zero, causing a trip in the AC system," Mr Busine said.
"The loss of the AC system then prevented the recovery of the DC system."
This meant the power station unit could not disconnect from the grid or shut down safely.
"Ultimately the turbine generator went from generating electricity to consuming electricity," Mr Busine said.
"It became an unstoppable sequence of events which led to the emergency evacuation of the site ahead of the destruction of the generator."
The turbine generator spun, and this, alongside the loss of other critical systems like lubrication oil pumps, caused the explosion.
Mr Busine thanked staff for their handling of the incident.
No-one was injured.
"All this happened within seconds — what's important to understand also is that the control room went black," Mr Busine said.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?