helllo, im not sure if this has been asked before, but i couldnt find it. If a mining companys say something like this in an announcement or prospectus:
1m @ 2.48 g/t AU
what exactly does it mean?
what would be an attractive number and what wouldn't?
in addition when in reports they grade holes e.g 0.90 (ppmAu) wat does that mean? and once again what would be an attractive number?
Open pit is more economical in regard to mining expenses. Easy to open pit down to 100m, then it starts getting more expensive. Anything under 500m is going to be more difficult. From what I've seen large resources 2m + shallow open pits at 2g/t are mineable. Underground at depth you need higher grades around 5 g/t ish perhaps all depending on size and complexity of the deposit. Lots of variables to consider and very difficult for us amateurs to make quality judgements about.
As a comparison, check PRU and AND and their deposits and valuation.
1m @ 100g/t ~ 100 meters down hole means they have to move at least 100 meters of dirt/rock/etc to get at the 1 meter they want...which is alot easier and cheaper than moving 300 meters to get at the same 1m @ 100g/t ~ 300 meters down hole.