As mentioned previously it was watchlisted, just havent been able to keep a close eye on those watchlists over the last 6 months. KKO moving positively, yet steadily, over the last month and a half.
Latest annoncement.
EXPLORATION CORING UPDATE AMERSFOORT PROJECT
• Exploration on the southern licence (Volksrust, 38ER) of the Amersfoort Project continues with strong intersections of gas observed in each of the nine completed exploration core holes;
o Each core hole has yielded gassy core samples (carbonaceous mudstones and coals);
o Wireline logs from the southern licence are consistent with the results from the northern license in indicating widespread gas accumulations in the sandstone sequences above and in some cases below the coal beds;
o The southern licence core holes have an average total depth of 610 metres (compared to ~410m on the northern licence), and should have a greater pressure regime and thus propensity for higher gas volumes.
• This news enhances the prospects that a potential gas field could be extensive across the entire Amersfoort Project current area of 1,601Km² (Joint Venture with Badimo Gas)
• As result of encouraging results an additional pilot test well program (5 test wells) is planned to commence by mid Q2 on the southern licence