Normal
i have read this announcement in detail. was greater than expected hence the rerating. But their Robe Exit prospect is wide spaced drilling and in "inferred" category. <55% is not DSO for this prospect. It will have to be sorted with the Kumina creek. Kumina creek deposit is very good. but 30% ownership hmm. Also production. AQA state these deposits are not part of their 1st stage of production(only Red hill and cullen). 2nd stage is not forecast until 2014-2015 at least. AQA will take 2 yrs to build stage 1 itself, and will take a while for these operations to reach steady state, before considering any expansions(2014). By that time iron ore prices could have fallen.
Hello and welcome to Aussie Stock Forums!
To gain full access you must register. Registration is free and takes only a few seconds to complete.
Already a member? Log in here.