Ahhhhh don't you love it when you have a win every now and again!!
I held both GBG and SDL when they announced the merger. I sold out completely of SDL on its last surge to 80c and did very nicely. It was a toss up whether to sell SDL or GBG but i'm so pleased i went the way i did seeing the result of todays announcement.
Lodestone results due out Wednesday, Share price now unburdend by the SDL merger fiasco. Will sentiment again turn Bullish on this stock
Juniors such as AGO have seen their share price surge to around the $2.50 dollar mark. Are they overinflated or will GBG now play catch up football and see share price growth?
Positive Lodestone results should light a fire under the share price.
I await eagerly the anoouncement of the results on Wednesday.
Thoughts?
Did GBG announce that the Lodestone results will definately be out Wednesday? ... can't seem to find anything conclusive.
I emailed Gindalbie, they replied same day. The September quarter figures are due next week, including the initial drill results of Lodestone.
Please correct me if I'm not talking about the same meeting but I believe the AGM is not until the 28th of November.
ASX ANN after close today
31/10/2007 Quarterly Activities Report
http://www.asx.com.au/asx/statistics/showAnnouncementPDF.do?idsID=00777790
HIGHLIGHTS FOR THE SEPTEMBER 2007 QUARTER
KARARA IRON ORE PROJECT (ANSTEEL EARNING A 50% INTEREST)
Mungada Hematite Project
• Resource estimation for the hematite project completed resulting in a Resource of 27.1 million tonnes at 61.7% Fe. Reserve calculation completed resulting in a product inventory of 14.3 million tonnes at 61.5% Fe.
• Bankable Feasibility Study completed resulting in a 6 year life project delivering 3 mtpa of ore and A$184 million LOM free cash flow. This produces a NPV10% of A$79.6 million and IRR of 27.5%.
• New Hematite prospects at BH7 discovered in the regional exploration program.
• Final draft of the Public Environmental Review document submitted to the EPA. Public review scheduled to commence in November 2007.
Karara Magnetite Project
• Reserve calculation completed for first 25 years of operations resulting in an initial Probable Ore Reserve of 497 million tonnes grading 36.3% Fe
• Iron Ore Concentrate of 197 million tonnes grading 68.2% Fe estimated to be contained within the initial Ore Reserve.
• Bankable Feasibility Study completed resulting in a 25 year project delivering 4 mtpa of concentrate and 4 mtpa of pellets. Financial outcomes of the BFS include a NPV9% of A$2.25 billion, IRR of 24.6% and IRRE of 37.5%. Cashflow over the 25 year life totals A$9.3 billion.
REGIONAL IRON ORE EXPLORATION (GINDALBIE 100%)
• Phase 1 drilling completed at the Lodestone Prospect, 50km south east of Karara. Better results include
273 metres @ 33.9% Fe from 80 metres
144 metres @ 32.9% Fe from 104 metres
156 metres @ 35.2 % Fe from 92 metres
• Initial DTR test work indicates a concentrate ranging from 65% to 70% Fe and 3.5 to 8.0% SiO2 can be achieved.
• Drill results and DTR results confirm a very large body of magnetite BIF is present at Lodestone which is amenable to standard magnetite separation and concentration processes.
• Further drilling of the eastern limb of the deposit is planned for the coming quarters.
CORPORATE
• Cash reserves at 30 September of A$59 million.
• Share Subscription Agreement with Ansteel finalised following receipt of all necessary Chinese regulatory approvals. 65 million shares issued at 60 cents each to raise $39 million.
• Joint Venture Development Agreement for the Karara Magnetite Project and Mungada Hematite Project signed with Ansteel in September in the presence of the President of The Peoples Republic of China and the Prime Minister of Australia
What's GBG share price doing?
The long awaited report is out yesterday.
ASX is at all time high today.
I didnt see much movement.
ASX ANN today
Market liked the ANN
GBG $1.615 +$0.105 +6.95 high of $1.64 1,297,210 shares $2,079,117 @ 07-Nov 11:13:25
07/11/2007 New High Grade Magnetite Discovery at Karara
http://www.asx.com.au/asx/statistics/showAnnouncementPDF.do?idsID=00780182
7 November 2007
NEW HIGH GRADE MAGNETITE DISCOVERY AT KARARA
KEY POINTS
• Extensive high-grade magnetite mineralization identified at depth beneath BH2 hematite deposit.
• Davis Tube testwork on this material produces a DR quality magnetite concentrate grading +70% Fe and 2% SiO2.
• Results confirm the Company’s view that the Karara hematite deposits comprise nearsurface supergene ore, marking areas of high-grade magnetite enrichment at depth.
• Ongoing drilling underway to further test this style of mineralization.
• New geological model being applied across the Karara Iron Ore Project, with potential to delineate substantial additional resources of high-grade magnetite.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?