TNG has $5 million in the bank according to its financials and drilling as we speak. Current market cap is $6.4 million, sure looks to be in good shape for a run![]()
TNG has $5 million in the bank according to its financials and drilling as we speak. Current market cap is $6.4 million, sure looks to be in good shape for a run![]()
TNG moved a little higher this morning, lets see what the week ahead holds. Drilling announcements usually spur on a buying spree in mining stocks. Investors buy on the hopes that drill results are of high grade, high volume and close to the surface.
tng has announced an initial resource estimate for its mount peake vanadium project in the northern terrirtory
further metallurgical testwork to be followed eventually by a scoping study...
Inferred Resource of 107 Mt 0.32 % V2O5, 5.9 % TiO2 at a 0.1 % V2O5 cut-off
...
sp currently down approx 6% on average volume
cheers![]()
Resource drilling completed, JORC to be updated in Sept
Pilot plant and PFS to be completed in Oct
Market cap of $20Million... a rerating is on the cards
UK brokers Old Park Lane Capital Plc.
broker report
ST target of 27C which is 3X the current of 9c.
http://www.tngltd.com.au/images/tngltd---ohxif.pdf.
New to the stock..very please with todays movement..
has great potential imo.. awaiting jorc update..
TNG SET TO COMPLETE MOUNT HARDY ACQUISITION AND COMMENCE NT COPPER EXPLORATION
http://www.asx.com.au/asxpdf/2012070...2dd7ghsfdn.pdf
Key Points:
TNG to complete acquisition of highly prospective 101.76km2 tenement in Mount Hardy Copper Field following receipt of FIRB approval for the transaction.
Exploration activities including an extensive airborne EM survey to commence within two weeks of completion.
Historical rock chip samples from Mount Hardy region range from 5% to 19% copper, up to 18% lead, 1.52% zinc, 2.66 g/t gold, and 170 g/t silver.
Limited modern exploration combined with anomalous previous work supports potential for the discovery of new mineralisation at Mount Hardy.
Historical rock chip sampling in the Mount Hardy area by White Industries (early 1990’s) and Tanami Gold NL (2002) returned numerous anomalous copper results, with peak grades of up to 19% copper, 18% lead, 1.52% zinc, 2.66 g/t gold, and 170 g/t silver.
With those sample grades this is worth watchlisting for later in the year.
My opinions are just that, MY opinions, NOT yours. Get your own damn opinions.
PRE-FEASIBILITY STUDY RESULTS BOOST POTENTIAL FOR ROBUST OPERATION AT MOUNT PEAKE
http://www.asx.com.au/asxpdf/2012070...tlfv4p9hcv.pdf
HIGHLIGHTS
Pre-Feasibility Study (PFS) results demonstrate exceptionally robust cash flows and positive returns from Mount Peake Iron-Vanadium-Titanium Project (NT):
o Pre-tax Nett annual cash flow of $294M
o Life-of-mine revenues of $11.8B
o Pre-tax IRR of 31.8%
o Exchange rate 1USD to 1AUD
o Initial 20-year life with significant extensions available
o 2.5Mtpa operation expanding to 5Mtpa after 3 years
o Average annual production of 15,300tpa V2O5, 375,000tpa TiO2 concentrate and 1.13Mtpa Fe2O3
o Year 1 pre-production capital cost estimate of A$339M
o Year 2 pre-production capital cost estimate of A$224M
o Potential pay back in 4 years
PFS compiled by independent consultants Snowden Mining, Sinclair Knight Merz (SKM) and METS.
Robust project at exchange rate of 1USD to 1AUD.
TIVAN™ a hydrometallurgical process that is being proven to be commercially viable: achieves excellent product recoveries of high purity vanadium and iron which will attract premium pricing.
Potential offshore location for the TIVAN™ processing facility to be considered, optimising CAPEX and OPEX and bringing additional strategic and financial benefits.
Potential to further value-add by downstream processing to produce higher-value Ferrovanadium (FeV) and Titanium products.
Chinese partners provide significant competitive advantage in ability to access Chinese finance, EPCM and end user markets.
Discussions with commodity traders and potential end-users has commenced.
2012 Pre-Feasibility Study Results
The 2012 Pre-Feasibility Study was prepared by key consulting companies Snowden Mining Industry Consultants Pty Ltd (“Snowden”), Mineral Engineering Technical Services (“METS”) and Sinclair Knight Mertz (“SKM”) to an accuracy level of ±25 per cent, required for PFS.
The Pre-Feasibility Study (PFS) is based on the updated JORC Indicated and Inferred Resource for Mount Peake published on 12 October 2011 of 160Mt @ 0.3% V2O5, 5% TiO2 and 23% Fe (Indicated 110Mt @ 0.29% V2O5, 5.3% TiO2 and 23% Fe; Inferred 48Mt @ 0.24% V2O5, 4.5% TiO2 and 21% Fe).
In addition to this resource, TNG has published an Exploration Target1 of 500-700Mt grading 0.2-0.4% V2O5 and 25-35% Fe.
The updated resource model compiled by Snowden Mining Consultants revealed that the Mount Peake deposit itself remains open to the east. In addition, recent regional drilling has highlighted the potential to further increase the Company’s resource inventory in the region.
The key points of the final PFS are:
Total material mined: 147.9Mt
Total waste movement: 72Mt
Total ore mined: 75.9Mt
Strip ratio: 0.95
Mine life: 20 years (including pre-production)
Processing rate (life-of-mine): 2.5Mt/annum, increasing to 5Mt/annum in year 4
Average head grade: 0.39% V2O5, 27.09% Fe, 7.02% TiO2
Average recoveries: 80% V2O5, 66% Fe, 55% TiO2
Total metal production: 236kt V2O5, 17.4Mt Fe, 5,822kt TiO2
The key financial outcomes of the final PFS are:
Total revenue (life-of-mine): A$11.8 billion
Operating cash flow (life-of-mine): A$5.8 billion
Nett cash flow (life-of-mine): A$5.05 billion
Pre-production capital cost estimate (including all infrastructure: A$563 million
Total operating costs (including mining, processing, transport & royalties): A$75.5/tonne of plant feed
Nett annual cash flow: A$294M2
IRR pre-tax: 31.8%
Key assumptions at commencement of operations include:
Operating costs and pit slope angles related to mining estimated to a Pre-Feasibility Study level (±25%)
V2O5 price of US$19,841/tonne (>99% grade)
TiO2 price of US$400/tonne (> 64% grade)
Fe2O3 price of US$200/tonne (>99.9% grade)
Royalty rate of 2.5% per tonne of plant feed
Discount rate of 8%
A$/US$ exchange rate of 1 US$ = 1A$
My opinions are just that, MY opinions, NOT yours. Get your own damn opinions.
HELITEM SURVEY COMMENCED OVER NT COPPER PROJECTS
Extensive airborne HELITEM® survey underway over key Northern Territory copper projects, including the recently acquired Mount Hardy Copper Field.
HELITEM® is the world’s most powerful helicopter time-domain electromagnetic system for detecting conductive targets, which represent potential accumulations of mineralisation.
The survey will comprise 1,683 line kilometres and will cover the Mount Hardy tenements and the Walabanba Hills Joint Venture Project.
The geophysical data acquired will provide the foundation for determining drilling targets to be tested later this year.
Acquisition of Mount Hardy Copper Field completed
My opinions are just that, MY opinions, NOT yours. Get your own damn opinions.
WESTERN DESERT RESOURCES COMMENCES DRILLING FOR GOLD AT ROVER JV PROJECT
http://www.asx.com.au/asxpdf/2012073...jbvxk19wtb.pdf
My opinions are just that, MY opinions, NOT yours. Get your own damn opinions.
"SULPHIDES INTERSECTED IN FIRST DRILL HOLE AT MOUNT HARDY COPPER PROJECT, NT":
http://www.asx.com.au/asx/statistics...idsId=01353462
Initial drilling at EM1 Target intersects 42m zone of disseminated and massive sulphides from 118m down-hole
I do not hold.
I've heard some positive rumours about TNG from around the traps and have been watching them of late. I tend to see support around 10c and resistance around 13c of late but that seems to have been broken today. Any thoughts on TNG as far charting goes or is the volume to low to form an analyst on it?
Bit of trivia with TNG changing it's name 5 times in the past. Between 1985-1991 it's company name was Sirius. Pity they didn't keep it...what a story for SIR.